PMElogo.jpg (16797 bytes)
                                                                     Precision Measurement Engineering, Inc.


Discussing SCAMP Maintenance

CLOSING THE SCAMP

  1. Examine the o-rings as described in the Inspecting the O-rings section.

  2. Insert the SCAMP electronics back into the tube until the o-rings engage.


    scampmanual6.jpg (100314 bytes)


  3. Replace the closure ring and tighten it, pulling the SCAMP electronics completely into the tube. Only tighten this ring until the electronics are completely in the tube. Loosen the ring slightly so that it will be easy to unscrew at a later date.

scampmanual3.jpg (122929 bytes)